City of London
Change of use of part of the north-western area of the churchyard (Class F1/sui generis to Class E) for the installation of a Piaggio truck of a maximum size 2.50m (l) x 1.59m (h) x 1.26mm (w) for the sale of coffee with associated tables and chair (up to three tables and six chairs) for a temporary use of 2 years.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/01149/FULL
- Local authority
- City
- Ward
- FT
- Application type
- All Other
Key dates
- Submitted
- 13 Nov 2024
- Validated
- 13 Nov 2024
- Comments close
- 19 Dec 2024
- Target decision
- 8 Jan 2025
- Decided
- 12 Feb 2025
Estimated project value
£15k–£100k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- City of LondonPendingNext door
- City of London EC4A 3AFPermittedAdjoining
- Holborn Viaduct City of LondonPermittedAdjoining
- City of London EC4A 3AFPermittedAdjoining
- City of LondonUnknown50 yd
- 3, 4 Holborn Circus City of London EC1N 2HAPermitted54 yd