City of London
Submission of (a) Samples of the proposed render to be used on all external faces of the building; (b) Details of the finish of the render where adjoining the proposed window surrounds and protection of stone cills; and (c) Methodology for the removal of the existing render, any cleaning and application method pursuant to condition 2 of planning permission 24/00134/FULL dated 08/07/2024.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/00867/MDC
- Local authority
- City
- Ward
- LB
- Application type
- All Other
Key dates
- Submitted
- 13 Aug 2024
- Validated
- 13 Aug 2024
- Comments close
- 2 Sept 2024
- Target decision
- 8 Oct 2024
- Decided
- 18 Mar 2025
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- City of London EC3M 6BBPermittedNext door
- City of LondonWithdrawnNext door
- City of LondonWithdrawnNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door