City of London
Alterations comprising of: (i) removal of a water feature, benches, and planters; (ii) installation of heel-safe mesh floor panels; (iii) installation of reconfigured doors and ventilation louvres; (iv) installation of planters alongside retained benches; (v) installation of ventilation extract planters; (vi) internal alterations to the internal layout, fit-out and finishes, including the installation of non-permanent partition walls, installation of new lighting, works to the kitchen services and store/cold rooms, and associated works (revised drawings).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/00367/LBC
- Local authority
- City
- Ward
- BP
- Application type
- All Other
Key dates
- Submitted
- 10 Apr 2024
- Validated
- 10 Apr 2024
- Target decision
- 5 Jun 2024
- Decided
- 17 Jan 2025
Estimated project value
£10k–£40k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Devonshire Square City of London EC2M 4AEPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door