City of London
Application under Section 96A of the Town and Country Planning Act 1990 (as amended) for non-material amendments to planning permission 21/00755/FULMAJ (dated 07.02.2022) including: (a) Revised Farringdon Street public realm arrangement, including a reduction in short stay cycle parking spaces and revised planter/bench arrangement; (b) Revised entrance door arrangement on Farringdon Street; (c) Realignment of the Northwest Corner Green Wall; (d) Revised entrance door arrangement on Holborn Viaduct; (e) Facade realignment along Newcastle close to remove stepped set out as approved; (f) Revised location of doors along Newcastle Close to coordinate with street levels; (g) Introduction of shadow box glazing to respond to internal UKPN requirements along Newcastle Close; (h) Amendments to the proposed glazing along Newcastle Close to respond to revised internal layouts; (i) Re-alignment of Level 11 North East corner to provide a smoother transition between facades; (j) Re-alignment of Level 13 North East corner panel realigned to respond to levels below; (k) Amendment to climbers from green walls at upper levels, to respond to maintenance and fire safety requirements; (l) Minor adjustments to the roof plan to accommodate design development on balustrades and fire requirements; (m) Minor adjustments to the eastern boundary to address buildability and party wall access requirements; (n) Revised materiality to the south facade of Farringdon St service yard to improve buildability and minimise maintenance requirements; and (o) Amendment to condition 63 (approved drawings) to incorporate the proposed changes.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/00228/NMA
- Local authority
- City
- Ward
- FN
- Application type
- All Other
Key dates
- Submitted
- 4 Mar 2024
- Validated
- 4 Mar 2024
- Comments close
- 18 Jun 2024
- Target decision
- 1 Apr 2024
- Decided
- 11 Nov 2024
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPendingNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door
- City of LondonPermittedNext door