Land At Aston Grange Aston Frodsham
Installation and operation of a ground mounted photovoltaic (PV) solar energy generation system (solar farm), energy storage facility and, associated infrastructure and engineering works in association with the laying of connection cable
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/03807/FUL
- Local authority
- Chester
- Ward
- Marbury
- Property type
- Agricultural
Key dates
- Submitted
- 20 Dec 2024
- Validated
- 24 Feb 2025
- Comments close
- 25 Mar 2025
- Decided
- 6 Aug 2026
136 documents · 0 comments · 0 constraints
Estimated project value
£40k–£80k
Typical UK cost for this job type, scaled for a large scheme, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Land Opposite To Aston Grange Aston FrodshamPendingNext door