Banbury Sewage Treatment Works Thorpe Mead Banbury
Upgrades at Banbury Sewage Treatment Works (STW) to address phosphorous limits: - Modifications to inlet channel - PST distribution chamber modification - Refurbishment of sludge screens - 2 x New Picket Fence Thickeners (PFTs) - Replacement of sludge transfer pumps - Chemical dosing units and storage tanks - Replacement RAS pumps - Air blowers - AI monitor at FE sampling point - Transformer - Generator & fuel tank - Odour Control Unit - Sludge Blending Tank MW.0143/26
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/03092/CMSO
- Local authority
- Cherwell
Key dates
- Submitted
- 9 Nov 2026
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.