AMCI Europe Building 90 A1 Bicester Motion Heritage Buckingham Road Bicester OX27 8AL
Alterations to Building 90 including installation of glazed doors, installation of air source heat pumps, thermal upgrades and changes to internal layout with associated screening and conservation works.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/02851/F
- Local authority
- Cherwell
Key dates
- Submitted
- 2 Nov 2026
Estimated project value
£8k–£15k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.