Northstowe Phase 3B Station Road Longstanton Cambs
Non-material amendment on application ref. 20/02142/OUT to vary the wording of Conditions 9 (Phasing), 16 (Access Works to the B1050 (Station Road, Longstanton)), 21 (Bus Stops), 27 (Ecological Design Strategy and Landscape and Ecological Management Plan), 30 (Sustainability strategy ? reserve matters), 34 (Surface water ? site wide), 36 (Surface Water Infrastructure Works), 37 (Temporary Storage and Management of Surface Water), 39 (Groundwater Monitoring), 40 (Foul Water Drainage Strategy), 42 (Construction Environmental Management Plan), 43 (Construction Waste and Management Minimisation Plan), 47 (Land Investigation and Remediation), 50 (Housing Delivery Statement), 54 (Open space and play areas strategy), 57 (Groundworks), and 59 (Waste Storage), along with the removal of Conditions 23 (Public rights of way) and 29 (Sustainability and Energy Strategies).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 20/02142/NMA2
- Local authority
- Cambridge
Key dates
- Submitted
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Target decision
- 27 Aug 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.