Brent
Non-material amendments of the following:*Additional fire escape door at ground level (North Facade)*Revisions to landscaping within the public realm*Revisions to the landscaping at podium level*Increased height of louvred zone at ground floor level (South and East Facade)*Metal colour change from RAL7006 to RAL8019 for all aluminium areasRevised Condition Wordingof Reserved Matters to Outline application reference 22/3208 dated 15/12/2022 for Reserved matters application in relation to hybrid planning permission 15/5550 (as most recently amended by planning permission 20/2844) for the access, appearance, landscaping, layout and scale for Plot NE01 comprising the construction of a single building arranged on ground and 19 upper storeys providing 770 student accommodation units (Use Class Sui Generis) with ground floor ancillary communal floorspace and a private communal landscaped garden for student use as well as associated plant, cycle storage, refuse provision, other ancillary space and associated infrastructure and public realm including new pedestrianised estates roads, and works to Rutherford Way and Fulton Road including the provision of parking and loading bays, and the installation of hard and soft landscaping, lighting and other associated works. Information is provided to discharge the following conditions for Plot NE01; 1: Layout, Scale, Appearance, Access, and Landscaping; 17: Student Accommodation Demand Assessment 19(d): Cycle Storage; 19(e): Car Parking; 19(h): Wind; 19(k): Internal layout of buildings; 19 (l): Access; 20(d): Contours and ground levels; 20(f): Provision of green/brown roofs; 25: Cycle routes; 30: Wheelchair Accessible Accommodation; 36: Vibration levels; 38: Air Quality; 49: Phasing Plan.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/2071
- Local authority
- Brent
- Ward
- Wembley Park
- Application type
- All Other
Key dates
- Submitted
- 25 Jul 2024
- Validated
- 25 Jul 2024
- Target decision
- 4 Oct 2024
- Decided
- 12 Nov 2024
Estimated project value
£15k–£120k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.