← Back to search

Permitted24/1054Submitted 2 years agoBoundary treatment

Brent

Details pursuant to condition 4 (south east ramp and gate 3) of Full Planning Permission reference 22/4289 dated 21 July, 2023, for Works to Wembley National Stadium to include installation of fencing and roller shutters (B1 and B2 Steps), external alterations to existing Club Wembley, staff, media and VIP entrances and staff fire exit, with perimeter fencing introduced adjacent staff and media entrances (all at Level B2), and installation of roller shutters within existing gantries (north-west and north-east ramps), development of a high-level 'Gate 3' fence (south-west concourse) and gated-fencing (east steps and south east ramp) (all at Level 1)

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
19 Apr 2024
— completed
Validated
19 Apr 2024
— completed
Consultation
—
— completed
Target date
7 Jun 2024
— completed
Decided
22 May 2024
— completed

Application details

Reference
24/1054
Local authority
Brent
Ward
Wembley Park
Application type
All Other

Key dates

Submitted
19 Apr 2024
Validated
19 Apr 2024
Target decision
7 Jun 2024
Decided
22 May 2024

Estimated project value

£2k–£10k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications