London Borough of Bexley
Application for non-material amendments to application 22/01564/FULM (dated 28.06.2023, including amendments to external site levels and internal finished floor levels; change in energy strategy from GSHPs to ASHPs; elevational changes at roof level; changes to building façades and parapet heights; amendments to internal layouts, relocation of residential units within the scheme; relocation of and reduction in wheelchair accessible dwellings (from 62 to 58) amendments to landscaping strategy; increase in on-site BNG; swapping of public art and green wall; realignment of access; update to overheating strategy and amendments to conditions: 2 (Approved Drawings); 3 (Details); 4 (Phasing); 18 (Materials); 19 (Public Art); 21 (Soft Landscaping); 22 (Hard Landscaping); 23 (Green Roofs); 27 (Waste Management); 28 (Detailed Highway Works Stadium Way); 29 (Detailed Drawings Estate Roads); 30 (Details of Sight Lines and Pedestrian Visibility); 35 (Estate Road Management Plan); 39 (Details of Riverside Footpath); 48 (Circular Economy Statement and Operational Waste Management Strategy); 49 (Implementation of Measures to Address Overheating); 51 (Details of Renewable Energy Technologies); 53 (Detailed Surface Water Drainage Strategy); 56 (Internal FFLs); 58 (Finished Ground Levels); 60 (Scheme of Riverbank Widening, Strengthening and Ecological Enhancement Works); 61 (Details of Scheme of Gravity Drainage); 63 (Details of Services); 64 (Long-term Maintenance Plan for Southern Riverbank); 65 (Detailed Maintenance Plan for Fluvial Floodplain and River Wansunt Culvert); removal of conditions 40 (Wind Mitigation), 59 (Scheme for Phasing of Flood Risk Reduction Measures) and 66 (Scheme for Crest Level of Southern Riverbank), and insertion of additional conditions.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 22/01564/FULMMIN
- Local authority
- Bexley
- Ward
- CRAYFN
- Application type
- All Other
Key dates
- Submitted
- 24 Oct 2024
- Validated
- 24 Oct 2024
- Comments close
- 26 Jun 2026
- Target decision
- 21 Nov 2024
- Decided
- 12 Jun 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of BexleyPermittedNext door
- London Borough of BexleyPendingNext door
- London Borough of BexleyPendingNext door
- London Borough of BexleyPendingNext door
- London Borough of BexleyPermittedNext door
- Maxim Road London Borough of BexleyPendingNext door