London Borough of Barnet
Renovation and extension of seven existing dilapidated garages to create a split level dwelling with a lower ground floor and an upper ground floor and a two storey street infill with a single storey glazed link adjacent to 63 Bow Lane. Associated landscaping and car parking
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 22/3330/FUL
- Local authority
- Barnet
- Ward
- WF22
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 27 Jun 2022
- Validated
- 27 Jun 2022
- Comments close
- 8 Aug 2022
- Target decision
- 22 Aug 2022
- Decided
- 22 Aug 2022
Estimated project value
£8k–£35k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade 2026 garage conversion cost guide.
Floor area gained: 255m²
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of BarnetRefusedNext door
- London Borough of BarnetRefusedNext door
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door
- London Borough of Barnet N12 0JLPermittedNext door
- Bow Lane Barnet N12 0JLPermittedNext door