London Borough of Barnet
Earthworks and site clearance including removal of fencing, concrete plinth and steps adjacent to A406/M1 Westbound Gyratory, and the erection of a primary sub-station providing 4 x 40 MVA transformers and associated switchgear space, surrounded by an architectural wrap structure extending up to 21m in height, together with associated landscaping and the construction of an access road adjacent to the Midland Main Line
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 21/2257/FUL
- Local authority
- Barnet
- Ward
- GG
- Application type
- All Other
Key dates
- Submitted
- 27 Apr 2021
- Validated
- 27 Apr 2021
- Comments close
- 19 May 2021
- Target decision
- 22 Jun 2021
- Decided
- 23 Jul 2021
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Floor area gained: 123m²
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door
- London Borough of BarnetPermittedNext door