← Back to search

Permitted2024/4050/LSubmitted 2 years agoLoft conversion

39 Marchmont Street London Camden WC1N 1AP

Repairs and refurbishment of residential units including repairs of main roof and replacement of the rear dormers, reinstatement of missing chimney pot, replacement of door to roof terrace, installation of balustrading to roof terrace and removal of services and boxing on the rear elevation, along with associated internal repairs and refurbishment of upper floor flats, including replacement of non-original stair floor and landing finishes, replacement of non-original ceiling lining at second and third floors, replacement of non-original partitions in all flats, replacement of non-original sanitary-ware and kitchen units in all flats and relocation of all servicing internally.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
19 Sept 2024
— completed
Validated
—
— completed
Consultation
—
— completed
Target date
—
— completed
Decided
5 Dec 2024
— completed

Application details

Reference
2024/4050/L
Local authority
Camden
Ward
Bloomsbury
Application type
Listed Building Consent
Property type
Flat

Key dates

Submitted
19 Sept 2024
Decided
5 Dec 2024

Estimated project value

£28k–£75k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade 2026 loft conversion cost guide.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications