← Back to search

Unknown2024/3852/PSubmitted over a year agoBasement

99 Bishopsgate London EC2M 3XD

Partial demolition of the existing building, retention and partial extension of existing basement and the construction of a ground plus 53-storeys (plus plant) (253.5m AOD) building to provide commercial floorspace (Class E); with market hall space on the ground floor for the following: flexible display of goods or retail/food and beverage (Class E(a)-(b)) and/or drinking establishments (Sui Generis); erection of a multi-purpose ground plus 5-storeys(plus plant) pavilion building (52.5m AOD) for the following: exhibition and/or performance space, learning, community use, creative workspace (Class F1, Sui Generis and Class (E(g)(i)); public cycle hub satellite building (26m AOD) (Sui Generis), public realm improvement works, hard and soft landscaping, provision of basement cycle parking and means of access, highway works and other works associated with the development of the Site.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
12 Sept 2024
— completed
Validated
— completed
Consultation
— completed
Target date
— completed
Decided
5 Nov 2024
— completed

Application details

Reference
2024/3852/P
Local authority
Camden
Ward
Holborn and Covent Garden
Application type
Request for Observations to Adjoining Borough
Property type
Commercial

Key dates

Submitted
12 Sept 2024
Decided
5 Nov 2024

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications