← Back to search

Permitted2024/2242/LSubmitted 2 years agoWindows and doors

The Shaftesbury Theatre 210 Shaftesbury Avenue London WC2H 8DP

Replacement of the existing dressing room heating services; removal of fourth-floor metal roller shutter to be replaced with an in-keeping brick wall and timber sash window; energy performance improvements, including a new air source heating and cooling systems and secondary glazing for the back-of-house dressing rooms; replacement of the existing secondary "get-in" door to match the existing dock door; and Fire protection upgrades to back-of-house areas to ensure safe emergency egress affecting a Grade II Listed Building.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
4 Jun 2024
— completed
Validated
— completed
Consultation
— completed
Target date
— completed
Decided
31 Jul 2024
— completed

Application details

Reference
2024/2242/L
Local authority
Camden
Ward
Holborn and Covent Garden
Application type
Listed Building Consent
Property type
House

Key dates

Submitted
4 Jun 2024
Decided
31 Jul 2024

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications