Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre
Plans and Specifications submission under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 for the construction of the Duddeston Junction Viaduct, associated reinforced concrete abutments and maintenance access infrastructure, attenuation basin, engineering earthworks, maintenance access strips, vehicle parking and turning areas, and the installation of vehicle restraint systems and permanent security fencing (revised submission of 2023/06670/PA)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2026/05825/PA
- Local authority
- Birmingham
Key dates
- Submitted
- 17 Sept 2026
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.