The Gallery Restaurant
Removal of reinforced autoclaved aerated concrete (RAAC) and roof; replacement of exterior glazing and doors; refurbishment of internal seating area including new floor, wall and ceiling finishes and refurbishment of adjacent WC including new sanitaryware; replacement and reinstatement of mechanical and electrical installations including lighting, emergency lighting and fire alarm systems; replacement of kitchen servery fire suppression system; and installation of upgraded ventilation systems.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 260:PLA-2026-001889
- Local authority
- Manchester
Key dates
- Submitted
- 14 Oct 2026
- Validated
- 14 Oct 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.