HMP Manchester
Non-Material Amendment to Planning Permission 145354/FO/2026 for the Installation of security baskets and amended window design, to amend Condition 2 (Specified Plans) by replacing approved drawing 17280 13.A0 (G Wing Proposed Basket Planning Drawing) with revised drawing 17280 19.A0.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 260:OTH-2026-001433
- Local authority
- Manchester
Key dates
- Submitted
- 7 Sept 2026
- Validated
- 7 Sept 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.