Birtles House
Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 260:OTH-2026-001247
- Local authority
- Manchester
Key dates
- Submitted
- 5 Aug 2026
Estimated project value
£5k–£40k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.