Land at Blackbird Close Crowland Peterborough PE6 0BA
Details of written scheme of archaeological investigation (WSI), biodiversity gain plan, written 30-year Habitat Management and Maintenance Plan (HMMP), contamination of land, pollution of controlled waters, existing and proposed site levels, proposed floor levels of the buildings, hard surfaced areas, garden/amenity areas, foul and surface water disposal, scheme of landscaping and tree planting, schedule of external materials and 3 integrated universal nest bricks (Conditions 3, 6, 7, 8, 9, 10, 11, 12 and 14 of H02-0545-26)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- H02-0733-26
- Local authority
- South Holland
- Property type
- Land
Key dates
- Submitted
- 31 Jul 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.