30 Bridge Hill and Land to the rear, Bridge Hill, Epping, CM16 4ER
Approval of Details Reserved by Conditions 7 Construction Method Statement (CMS), 9 Hard and Soft Landscaping, 10 Tree Protection Plan and Arboricultural Method Statement (TPP/AMS), 11 Contaminated Land, 12 Construction Environment Management Plan (CEMP), 13 Landscape Ecological Management Plan (LEMP), and 17 Habitat Management and Monitoring Plan (HMMP) of EPF/0863/25 (Demolition of one residential dwelling on Bridge Hill and the construction of nine new dwellings, incorporating new access, parking, landscaping, and pedestrian and cycle connections).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 105:EPF/1606/26
- Local authority
- Epping Forest
- Property type
- House
Key dates
- Submitted
- 19 Aug 2026
Estimated project value
£200k–£420k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyBuilder / RapidQS 2026, ~120m² at £2,000-£3,500/m².
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.